Case Study

In 2014, IHC retrofitted the protection and control equipments for three 600V 250kW induction generators of the Eganville Power Station in Renfrew County, Ontario. The principal objectives were to provide improved protection and control with greater visibility and to enable unmanned operation of the site. The installation involved three of IHC’s Small Hydraulic Generator Control Systems, combined with installing a site LAN to facilitate inter-device communications and remote access.